Dualisation of Owerri – Onitsha Road Section II

Project:
Dualisation of Owerri – Onitsha Road Section II
Main Contractor: Julius Berger Nigeria Plc
Employer/Owner: Federal Ministry of Works
Project Status: Completed (Within guarantee period)

Scope of Work:
The works consist of the Dualisation of 35.3km length of Road. It also involves the construction of two (2No) Bridges over Njaba River. The Road was reconstructed to a 7.3m wide of Asphaltic Concrete dual Carriageway separated by reinforced concrete barriers with a 2.75m wide surface-dressed outer shoulder and 1.5m wide inner shoulders with provision of 200mm sub-base and 200mm crushed stone base, 60mm and 40mm Asphaltic Binder and Wearing Courses respectively.

Other works include drainage structures, extension of existing culverts, kilometer posts, road signs and markings etc.